Difference between revisions of "Guidance Notes-PD-v2"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
* [[PD_Writing Tips_v2| Writing Tips]] | * [[PD_Writing Tips_v2| Writing Tips]] | ||
* [[PD_Useful Verbs_v2| Useful Verbs]] | * [[PD_Useful Verbs_v2| Useful Verbs]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= '''Part 0 Cover''' = | = '''Part 0 Cover''' = | ||
Line 24: | Line 18: | ||
* [[Business Continuity Plan (BC Plan)| Business Continuity Plan]] | * [[Business Continuity Plan (BC Plan)| Business Continuity Plan]] | ||
− | + | = '''Table of Content''' = | |
* [[PD_Table_of_Content_v2| Table of Content]] | * [[PD_Table_of_Content_v2| Table of Content]] | ||
− | + | = '''Checklist Prior to Submission (Part C)''' = | |
* [[PD_Checklist_v2| Checklist]] | * [[PD_Checklist_v2| Checklist]] | ||
Useful Link on related terms: [[BCMBoK 5: Plan Development]] | Useful Link on related terms: [[BCMBoK 5: Plan Development]] |
Revision as of 04:12, 27 January 2020
Contents
Guidance Notes to Complete the Business Continuity Plan Template
Plan Development Considerations
- The sample plan provides examples of how to write a complete business continuity plan.
- A plan should be thoroughly developed, addressing procedures to be used before, during and after a disaster.
- These procedures should include methods for maintaining and updating the plan.
- The sample plan illustrates the structure and writing styles mentioned above.
- Some sections of the sample plan are written as examples that the organization can use in a plan, others are instructional.
- The instructional sections provide information that should be considered when writing the specific segment.
- This template provides only a sample of a complete business continuity plan.
- Writing Tips
- Useful Verbs
Part 0 Cover
- Organization Logo (Insert)
- CONFIDENTIAL
- Name of Business Unit (Change Name)
- Business Continuity Plan
Table of Content
Checklist Prior to Submission (Part C)
Useful Link on related terms: BCMBoK 5: Plan Development