Difference between revisions of "Disaster Recovery Life Cycle"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
<br><br> | <br><br> | ||
{{BcmBoK 5 CL 1D}} | {{BcmBoK 5 CL 1D}} | ||
− | |||
{{Template:BLCoursesBanner}} | {{Template:BLCoursesBanner}} | ||
{{Bcm Institute Source}} | {{Bcm Institute Source}} | ||
|} | |} | ||
− | + | {{Template: BookMGITDR}} | |
[[Category:BCM Institute Glossary]] | [[Category:BCM Institute Glossary]] | ||
[[Category:BCM Institute DR Glossary]] | [[Category:BCM Institute DR Glossary]] |
Latest revision as of 03:15, 27 October 2020
1. This Disaster Recovery or DR Life Cycle consists of the 6 “R’s”. The time period where each “R” will be implemented is as follows:
Note (1): DR Life Cycle: Reduce(R1), Response(R2), Recover(R3), Re-sync(R4), Resume(R5), Return(R6). Note (2): BC Life Cycle: Reduce (R1), Response (R2), Resume (R3),Recover (R4), Restore (R5), Return (R6).
|