Plan Development
Jump to navigation
Jump to search
![]() ![]() Notes (1): It is to determine the procedures for notifying the right people, assessing the operational impact. Notes (2): It is also to develop specific steps for minimizing the risks of an outage, and restoring normal operations after the outage. Notes (3): The output from this step is the BC Plan CM Plan, CC Plan or DR Plan. Related Terms: BCM Planning Process or Methodology, DR Planning Process or Methodology.
![]()
![]()
|
