Guidance Notes-PD-v2

From BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Revision as of 08:13, 19 December 2019 by Fariz (talk | contribs) (Fariz moved page Guidance Notes-C-PD-v2 to Guidance Notes-PD-v2)
Jump to navigation Jump to search
Plan Development Template Copyright @ GMH Pte Ltd
Implementing Your Business Continuity Plan BUY!

Plan Development Considerations

  • The sample plan provides examples of how to write a complete business continuity plan.
  • A plan should be thoroughly developed, addressing procedures to be used before, during and after a disaster.
  • These procedures should include methods for maintaining and updating the plan.
  • The sample plan illustrates the structure and writing styles mentioned above.
  • Some sections of the sample plan are written as examples that the organization can use in a plan, others are instructional.
  • The instructional sections provide information that should be considered when writing the specific segment.
  • This template provides only a sample of a complete business continuity plan.
  • Writing Tips
  • Useful Verbs

Back >> Plan Development

Part 0 Cover


Table of Content

Checklist Prior to Submission (Part C)

Useful Link on related terms: BCMBoK 5: Plan Development