FERC RM01-12-00
Revision as of 16:07, 9 December 2008 by Oldstaff-Jialin (talk | contribs) (New page: == Description == FERC requires a disaster recovery plan for all energy companies. This regulatory requirement is mandatory. == Scope == Applies to the US electric power industry, specif...)
Description
FERC requires a disaster recovery plan for all energy companies. This regulatory requirement is mandatory.
Scope
Applies to the US electric power industry, specifically larger metro utilities (rural utilities exempt)