Difference between revisions of "BCP Part B Corporate Level Procedures v2"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | {{Part B Corporate Level Procedures}} | ||
{{Button Back BCM PD}} | {{Button Back BCM PD}} | ||
= <span style="color:#0000FF"> Explanatory Notes for '''Part B Corporate Level Procedures''' = | = <span style="color:#0000FF"> Explanatory Notes for '''Part B Corporate Level Procedures''' = |
Latest revision as of 05:15, 17 June 2021
Explanatory Notes for Part B Corporate Level Procedures
Part B of this plan sets out the sequential procedures to be undertaken upon activation for the entire organization.
- Accountibiity: The Organization BCM Coordinator will determine the sequence and integration of al the business unit plan (Part C) with the corporate level plan (Part A & Part B).
- In the event of a disaster, each BU BCM Coordinator is to reference the business unit recovery (Part C) to sequence as shown in Part B and follow through with the procedures that he or she is responsible for.
- This plan is written by the Organization BCM Coordinator for the Business Unit (BU) BCM Coordinator or BU BCM Coordinator and the Alternate Business Unit BCM Coordinator (Alt BU Coordinator). It forms the second section of the business unit BC plan.