rilpoint_mw113
Personal tools
Log in
BCMpedia. A Wiki Glossary for Business Continuity Management (BCM) and Disaster Recovery (DR).
Search
Navigation
Home
About BCM Institute
BCM Glossary
DR Glossary
BCM Audit Glossary
Supply Chain BCM Glossary
Pandemic Flu Glossary
Crisis Communication
Acronyms
Request Changes
BCM Institute Website
BCMI Forum
Resources
Courses
Examination
Certification
Recertification
Meet-the-Experts
World Continuity Congress
Knowledge
BCMBoK
BCMBoK (Audit)
Competency Level
Standards
BCM Glossary
ISO22301 Glossary
ANZ5050 Glossary
ASIS Glossary
BS25999 Glossary
MS1970 Glossary
NFPA1600 Glossary
SS540 Glossary
ENISA Glossary
ITIL Glossary
Books
BCM Series
Specialist Series
Acknowledgment
Associates
Contributors
Toolbox
What links here
Related changes
Special pages
Printable version
Permanent link
Category:DR Glossary
Category
Discussion
View source
History
Pages in category "DR Glossary"
The following 111 pages are in this category, out of 111 total.
A
Alternate Site
Application Failover
Asynchronous
Asynchronous Replication
Availability
B
Backup
Backup Facility
Backup Media
Backup Strategy
Business Continuity Testing Cycle
C
Classification of Systems
Cluster
Clustering
Cold Site
Commercial Cold Site
Crate and Ship
Critical Applications
D
DBMS Data Log Backup
DR Planning Process or Methodology
Data Mirroring
Data Protection/Recovery Strategy - Category
Data Recovery Strategy
Data Replication
Data Synchronization
Database Replication
Database Shadowing
Declaration Fee
Differential Backup
Disaster Declaration
Disaster Declaration Threshold
Disaster Recovery
Disaster Recovery DR Glossary
Disaster Recovery Life Cycle
Disaster Recovery Plan (DR Plan)
Disaster Recovery Planning (DRP)
Disaster Recovery Planning Team
Disaster Recovery Team
D cont.
Disk Mirroring
Downtime
E
Electronic Vaulting
F
Failover
Fault-tolerant
Full Backup
H
High Availability
Hot Backup
Hot Site
I
Incident Management
Incident Management Plan
Incident Response
Incident Response Plan
Incremental Backup
Inter-dependencies
J
Journaling
L
Live Test
Load Balancing
Local Area Network
M
Major Application
Manual Failover
Maximum Acceptable Outage (MAO)
Maximum Acceptable Outage Time (MAOT)
Maximum Allowable Downtime (MAD)
Maximum Tolerable Downtime (MTD)
Mirror Backup
Mirroring
Mobile Recovery Site
Mobile Site
Mobilization
N
Network Attached Storage
O
Offsite Backups
Offsite Storage
Online Backup
Online backup
Organization DR Coordinator
P
Planning Software
R
Re-sync
R cont.
Reciprocal Agreement
Recover
Recovery Objectives - Category
Reduce
Redundant Arrays of Independent Disks (RAID)
Remote Failover
Remote Journaling
Remote Mirroring
Remote Tape Vaulting
Replication
Request for Proposal
Response
Restore
Resume
Return
S
Service Level Agreement
Storage Area Network
Synchronous
Synchronous Replication
System
System Development Life Cycle
T
Team Mobilization
Test - Checklist
Test - Cutover
Test - Disaster Recovery Plan Test Cycle
Test - Full Interruption
Test - Paper
Test - Parallel
Test - Structured Walkthrough
Test - Tabletop
Test - Walkthrough
Type of Tests
U
Uninterruptible Power Supply (UPS)
V
Virtualization
W
Warm Site
Wide Area Network